I will try and get a price asap if there is going to be a few of them to do. The first one took 4 hours to do as there was some designing to be done and cutting out the metal was time consuming to get it as neat and tidy as possible but if we were to do a production run of them we could make the templates and get them water cut to save time and money.
For a 1 off it is about £225 for labour, parts and sundries.